Our Projects

1. The new Clifford Pier @ Marina South project
A small fabrication yard for pre-cast was set up at Pandan to construct the pre-cast curtain walls for the breakwater and pre-cast staircase for the jetty. The items were later transported to Marina South for installation. In total, 3 jetties were built with one of them adjoining the 1 km long breakwater.





2. PSA Port project
The project is an extension of the existing PSA Port at Pasir Panjang that involves the building of
additional container berths and stacking yards. A pre-cast yard was set up for fabricating pre-cast
beams and slabs.





   
  TNS Construction